New apartment possession checklist before you start interiors
What to check, measure and decide between getting the keys and starting work - snags, electrical points, plumbing, society rules and sequencing.
Getting the keys to a new apartment feels like the finish line. In practice, it is the start of a short window that shapes how smoothly your interiors will go. What you check, record and decide in these first days saves rework, money and arguments later.
Many people rush straight into choosing laminates and sofa fabrics. The finishes can wait. First you need to know exactly what the builder has handed over, what needs fixing before any interior work begins, and what rules you have to work within.
Here is a checklist to work through, roughly in order.
1. Walk the flat for snags before anything else
Snags are defects in the builder's work. Raise them now, in writing, while the builder is still responsible for fixing them. Once your interiors go in, it becomes much harder to prove who caused what.
Go room by room in daylight and look for:
- Cracks in walls or ceilings, and uneven plaster
- Hollow-sounding, chipped or uneven floor tiles
- Doors and windows that do not close or lock properly
- Gaps around window frames where rain could get in
- Damp patches, especially near bathrooms, kitchens and external walls
- Uneven slopes in bathroom and balcony floors, so water does not drain
- Missing or loose fittings, switches and sockets
Photograph everything with the date, and share a written list with the builder. Ask for a date by which they will be fixed.
2. Test the services
Turn on every tap, flush every toilet and check every drain. Look for leaks under sinks and around pipes. Run water in the shower and on the balcony to see where it goes.
Switch on every light and test every socket. If you are unsure, have a qualified electrician check the main board, earthing and circuits before you plan any changes. Any concerns with wiring, gas lines or waterproofing should be assessed by a qualified professional, not guessed at.
3. Measure everything accurately
The builder's brochure plan is a starting point, not a measurement. Real rooms are rarely perfectly square, and walls, beams and columns often differ from the drawing.
Measure, or have your designer measure:
- Every wall, including window and door positions and heights
- Ceiling heights, and the depth and position of beams
- Columns and any projections
- The positions of every electrical point, switch board, AC point and plumbing outlet
These measurements become the foundation of every drawing that follows.
A plan drawn from the brochure is a guess. A plan drawn from site measurements is a design.
4. Map electrical points against your layout
Builders place sockets and switches to suit a generic layout. Yours will be different. Before any furniture is designed, decide roughly where the bed, sofa, TV, study desk, dining table and kitchen appliances will go, then check whether the points match.
Common changes include adding sockets beside the bed, moving the TV point, adding points inside wardrobes or the kitchen for appliances, and planning conduits for ceiling lights. All of this is far easier before ceilings and woodwork go in.
Think about appliances that are easy to forget at this stage. Air conditioners need points and a drain route for water. Geysers need a point in each bathroom. A water purifier needs a socket and a water line near the sink. An inverter or power backup needs a location and wiring. A washing machine needs a point, an inlet and a drain together. Listing these now prevents awkward exposed pipes and cables later.
5. Check plumbing and kitchen positions
Note where the inlet and drain points are in the kitchen, bathrooms and utility area. Moving them is possible but involves breaking floors and walls, waterproofing again and coordinating trades. Decide early whether your kitchen layout will work with the existing positions. Our guide on how to plan a modular kitchen explains how the room's services shape the layout.
6. Read the society rules
Most housing societies have rules for interior work. Get a copy before you sign anything with a contractor. Look for:
- Permitted working hours and days
- Rules on noise, drilling and demolition
- Lift usage and delivery timings
- Debris disposal arrangements
- Deposits or permissions required before work starts
- Restrictions on changes to balconies, windows or the building's exterior
These rules affect your timeline more than most people expect.
7. Decide the order of work
Interior work has a natural sequence. Getting it wrong means undoing finished work. A typical order is:
- Builder snag fixes
- Civil changes, if any
- Electrical and plumbing changes, with waterproofing where needed
- Flooring, if being changed
- False ceiling framework
- Woodwork installation
- Countertops, fittings and fixtures
- Painting and final finishing
- Deep cleaning
Our guide to the interior project timeline explains what happens in each stage in more detail.
8. Gather your own decisions
While the site checks happen, work out your own priorities. Who will live here? Which rooms matter most? What is your budget range, and what furniture are you keeping? Our guide on what to decide before meeting an interior designer covers this in full.
Keep one folder for everything
Create a single folder, physical or digital, for the flat. Keep the builder's plans, your measurements, snag photos and correspondence, society rules and permissions, and any warranty cards for fittings the builder has installed. Add your designer's drawings and quotes as they arrive.
It sounds like a small thing. It becomes very useful when you need to show the builder a snag photo, check a measurement on site, or confirm what the society approved.
A few things not to do yet
- Do not buy furniture before the layout is final
- Do not paint before electrical and ceiling work is complete
- Do not let anyone start drilling before the society has given permission
- Do not sign off the builder's handover until snags are recorded
If you have recently taken possession and want help turning a bare flat into a home, share your brief with us and we can start with a proper site measurement.